[SMM Analysis] China's Unwrought Cobalt Exports, Imports Drop Back Slightly in May 2025

Published: Jun 20, 2025 13:50
[SMM Analysis: China's Unwrought Cobalt Imports and Exports Drop Back Slightly in May 2025] In May 2025, China's unwrought cobalt imports amounted to approximately 651 mt (metal content), down 23% MoM and up 189% YoY. In the same month, China's unwrought cobalt exports reached around 2,986 mt (metal content), down 27% MoM and up 433% YoY.

In May 2025, China's imports of unwrought cobalt were approximately 651 mt (metal content), down 23% MoM and up 189% YoY. In terms of average import prices, the average import price of unwrought cobalt in China in April 2025 was $30,306/mt (metal content), up 12.96% MoM. From January to May 2025, cumulative imports reached 2,990 mt (metal content), with a cumulative increase of 178.4% YoY.

 

In terms of exports, China's exports of unwrought cobalt in May 2025 were approximately 2,986 mt (metal content), down 27% MoM and up 433% YoY. In terms of average export prices, the average export price of unwrought cobalt in China in March 2025 was $32,302/mt (metal content), up 3.80% MoM. From January to May 2025, cumulative exports reached 10,383 mt (metal content), with a cumulative increase of 232.68% YoY.

 

 

 

 

 

 

 


SMM New Energy Research Team

Wang Cong 021-51666838

Ma Rui 021-51595780

Feng Disheng 021-51666714

Lv Yanlin 021-20707875

Liu Yujun 021-20707895

Zhou Zhicheng 021-51666711

Xiao Wenhao 021-51666872

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
9 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
9 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
9 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
9 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
9 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
9 hours ago
[SMM Analysis] China's Unwrought Cobalt Exports, Imports Drop Back Slightly in May 2025 - Shanghai Metals Market (SMM)